Home

  

Services

  

efficientSolutions

  

'The System'

  

Resources

  

About


About Kure


Background

Kure Consultants (Kure and Associates) originated during the advent of the Quality Movement in the 90s, deploying TQM principles and certifying organsations to the ISO 9001 Quality Management Standard.

 

Improving and optimising processes through technological advances, a natural progression was six sigma qualification and driving projects (green/black belt) resulting in exceptional cost and time efficiency savings.


In evaluating the lagging and lacking systems leadership concepts and maturity levels within the resources/project management sectors, compared to the manufacturing industry, systems, process and improvement capabilities were effectively transfered to major capital project study phases and project leadership execution planning deliverables.


Additionally, recognising a distinct market gap for effective platforms to implement, manage and track major project and enterprise systems, processes and improvement, we have designed, programmed, built and delivered value-add and economically efficient online/mobile device business solution eApplications for:


 - eDocument - version control and retrieval of all internal/ external documents and records

 - eAudit - process and project online compliance

 - eEvent  - identify, investigate and track all system and process activity events

 - eSafety - record track and stratify cause type/location of all safety incidents

  


Nik is a driven professional, with effectively demonstrated success in systems, business process management and improvement strategies.


- As a key influencer with extreme commitment to business process excellence, Nik promotes customer/client service as a significant improvement driver resulting in increased stakeholder value.


A business improvement advisor for:

- Certified ISO Leadership systems

- Improvement methologies and implementation

- Capital project study phase and execution planning and deliverables

- Technical document development and compilation

- Delivering efficient on line business solutions

2411150854p Rev increased stakeholder value delivering


(Business improvement advisor for:)

n Certified ISO Leadership systems


n Delivering Efficient On line Business Solutions:

       - eDocument control and retrieval of all internal external documents and records

       - eAudit - online compliance reports

       - eEvent  - identify investigate and track all System and process activity events

       - eSafety - record Track and Stratify Cause  Location of all Safety Incidents


progression was qualification to  Six Sigma Black Belt and driving Projects (Green/Black Belt) to achieve exce


In evaluating the lagging and lacking Systems leadership concepts and maturity levels (compared with the manufacturing industry) within the Resources/Project Management Sectors, Systems, Process and Improvement capabilities were effectively  transfered to Major Capital Project Study Phases and Project Leadership Execution Planning Deliverables

(WHERE THE CONCEPTS OF EFECTIVE WRITING PRESENTATION AND SUBMISSIONS WERE INTRODUCED TO PROJECT TEAMS )

previous Assignments: Assess Compliance High Risk Levels and Update Procedures



Recognising a distinct market gap for effective platforms to implement manage and control Organisational systems Process and improvement, we have designed,  programmed built and delivered value-add and economically efficient  on line/mobile device business solution eApplications for :


 - eDocument - Version, control and retrieval of all internal external  documents and records

- eAudit - online compliance checks for Processes capital assets> projects infrastructure, findings.

key feature compared with other apps with instantly accessible historical reports / finding for effect reports instantly accesed

- eEvent  - identify investigate and track all System and process activity  events

- eSafety - record Track and Stratify Cause  Location of all Safety Incidents


CONSIDER 24 04 02  - WRITING CONSULTING WORK  - MORE DETAIL  - COM


01 11 to DT Services Copy collaboration  - also add earth circle radius. As Mc Kinsey?

01 17 bac

k to about page.

  update assignment page with case study structure

03 07 pm


24 03 22 03 19 Add Principles - Structure from Page 11 hard Copy

01 Principle

- Discover Business systems.

 - Enable processes

eServices

02 Definition (what ) Level01

03 Definition Level 02 eg enable processes (01 Define collaborate implement)

04  Benefits Values 05 Industry Fields and Examples

06 topic and example

eg mining health and safety instructions

enhance improvement to enable processes for Creating better systems

schedule pull down menu e programming Saturday

added to index page  - green

80 % think 20 % Do 

+++++++++++++++++++++++++++


Vision Policy

Policy

Vision/Mission


- We aim to be the only source for clients to fully understand and practically implement methodologies to 1st and foremost Envision Systems, to effectively Enable Processes and permanently, by design, Enhance Improvement


- We advise provide efficient and effective Business Excellence Systems, Processes and Improvement totally aligned with our Client's future.


- Through our sustained leadership, collaboration and partnership, we maintain an uncompromising commitment toward Continuous Improvement


- We train our staff in Systems Process and Improvement Leadership needs & responsibilities


- We work closely with our customers to provide the highest quality standards with new and innovative solutions


- We communicate all service level Objectives to our Clients' interested parties

  

 


Clients

25 03 27 12 16 add application clients - medi quip mendham tmq

MediQuip CQ FMS Newcrest AOQ QLD Steve Battia Kate Perry REMOVE GC 

 


Testimonials

"You kept us accountable"

Project Controls EPCM General Manager, May 2022

"We will role this out as a global policy"

Procurement Manager

Global gold miner, September 2023

"When your're here, you help us to think differently"

Manufacturing Director, Aug 2023

"We see the designed new format, identifying hazards, controls at each stage as an improvement opportunity for us."

Infrastructure Manager Petrochemical producer retainer Oct 2022

 


Timeline

Envisioning Systems, Enabling Processes & Enhancing Improvement


90's

- ISO 9001-1987 1995 Certification/ QS 9000

- Custom Lotus Notes Document Management

Metals

Automotive

Power Cables


00's

- ISO9001 - 2000

Certification

- Six Sigma

- Project Studies Compliance

- html Systems Applications

Metals

Communication Cables

Resources

Tunnelling


10's

- Capital Project Studies/ Execution Compliance & Deliverables

- ISO 9001 2008/2015 14001 4801

- BRC Food Safety

- Online Safety System Applications

- Resources Coal, Lead/Zinc

- Energy Coal/Oil Power Generation Maintenance

- Metals Fabrication/ Machining

- Food Yoghurt

- eApps eSafey


20's

- ISO 9001 - 2015,

- Design reviews,

- On line eDocument eAudit Applications 

- ISO45001 Process upgrade

- Project Feasibility Study Compliance

- Policy

- Electronics Assembly

-Transportation Surveys

Product Compliance 

- Installation/Field Servicing ISO45001 Recovery

- Resources Lead Zinc Refining

- Petrochemical Fuelling

- Procurement Mining


see

Rev 25 02 21  - add medi quip to 2020 . and e doc roll out 25 01 19 08 21 DELETED NEXT ELEMENTS IN C DRIVE

CMobile_V8_ALL_PAGES_AT_25_01_09

industries title. more elements in for dt page

ISO 3902 - 1987

Metals Fabrication Original Company Certification

Quality Consultant

Diploma in Quality Technology

Lead Auditor Training

Company Quality  / consultancy office iso planning/ client presentations/ manuals reviews  

AS 3901-1995

Automotive (incl Design) Original Company Certification

QS 9000 Automotive Compliance

Site Roll Out

AS 3901- 1995

HV Power Cable Fabrication Certification

ISO 3902 - 1995

LV & Comms cable Fabrication - Recovery Plan/Re Certification

25 01 19 08 21 DELETED NEXT ELEMENTS IN C DRIVE

CMobile_V8_ALL_PAGES_AT_25_01_09

industries title. more elements in for dt page


00's

ISO9001 - 2000 / 14001

Certification Tunnelling Construction

Supply/Service Compliance

Toll Road/Bridge, Infrastructure, Fabrication Projects    

ISO9001 - 2000 / 14001 /Six Sigma Black Green Belt

Comms Cable Fabricat./Assemb. Certification and Improvement

 

Mine Life Expansion Pre- Feasibility Compliance

Underground Gold Mine

ISO 9001-2008 14001 48001 Compliance Assessments

SEQLD Council

Presentations

Six Sigma Black Belt Training

Inaugrual SAI Global Six Sigma Conference

Corporate Quality Conferences, North Carolina, Nevada USA

  


10's

Definitive Study Compliance and Process Deliverables

Coal Mine Expansion and Project Delivery Hub

Project Execution Process Management Deliverables

Greenfield Lead/Zinc Silver Mine

ISO 9001 - 2008 

Certification Pressure Vessels Fabrication

ISO 9001 2015/14001/4801

Certification coal mining mechanical / electrical equipment overhaul

Coal/Oil Power Station Shut Down Asset Maintenance

BRC Food Safety Standard

Certification and internal audit training yoghurt manufacturer

ISO 9001 - 2015, Coaching & eSafety online Systems App

Certification/ Re certification Diesal Engine Reconditioning and General Engineering Fabrication

Infrastructure Maintenance Management Plan  -Coal Power

Electrical Safety Management Plan (SCL)

∙ Asset Maintenance;

∙ Facilities Maintenance;

∙ Overhauls; and

∙ Projects.


20's

ISO 9001 - 2015, Design review & on line Apps 

Certification/ Re-certification/Client launch eDocument, eAudit & eEvent Apps Marine Electronics Design Fabrication / Shipping Survey

Feasibility Study Zinc Book Compliance

Lead/Zinc/Silver Pyro Metallurgical Refinery Upgrade

ISO 45001 Plan, Process & Web Site upgrade

Uninterupted Power Supply Installation Servicing  

2019/2020 Medical Equipment Supply ISO 9001 recovery Program

Leadership Objectives Template

Risk Management training

Audit Template

eDocument Application and control user guide

Context

 

Industriesg

Industriesg

REV241010 images photos only

Metals

Assembly

Resources

Infrastructure

Food

General

orange C DRIVE

CMobile_V8_ALL_PAGES_AT_25_01_09 link

25 01 19 08 13 NO INTERNAL LINKS  - AS YET.. FOR MOBILE PAGE ONLY AS I FRAME 2412270821 REMOVE>R58 MENU ACTION